Checklists for an owner's monthly walkthrough, for the day a fire inspector visits, and for records and impairments, plus a map of every Sterling guide and article worth reading.

How to use these guides

Run the checklists below month to month, and open the linked guides when you need the reasoning behind a rule. Every checklist sticks to work the fire code lets owner staff do. Anything that needs a qualified contractor is called out as such, not slipped in as a task for the caretaker.

The standards behind them are the editions Alberta references, not the newest ones. That means NFPA 25-2017 for sprinklers, standpipes and fire pumps, NFPA 10-2013 for extinguishers, and CAN/ULC-S536:2019 for fire alarms, all under the National Fire Code 2023 Alberta Edition (NFC(AE) 2023). The full frequency table sits on the fire system inspections page. The code framework is in the fire code compliance guide.

A monthly walkthrough for owner staff

Somebody in the building can do all of these without a certificate, or with training the code recognizes.

  1. Fire alarm: run the daily and monthly checks your alarm company trained you on. CAN/ULC-S536 lets the owner or a representative trained by the manufacturer or service provider do them (Division C, 2.2.4.3). Before any test, tell monitoring, occupants and anyone else your notification procedure names.
  2. Extinguishers: inspect each one monthly, and confirm it's in place, visible, unobstructed and undamaged. Enter the inspection on the tag by hand, because the code requires handwritten monthly and annual entries.
  3. Emergency lights and exit signs: test self-contained lighting units and battery-backed exit signs monthly (Division B, 6.5.1.6 and 6.5.1.8). The yearly full-duration test is a longer job, so book it.
  4. Generators: weekly and monthly checks, but only by someone trained by the generator's manufacturer or service provider (Division C, 2.2.4.7).
  5. Access: sprinkler control valves, fire department connections, hydrants, panels and riser rooms stay clear and reachable. Nothing gets stacked against a riser.
  6. Damage: walk the floors, note leaks, damaged devices and anything that looks tampered with, and call your contractor. Don't repair it yourself.
  7. Log: date and initial everything, and file it with the rest of the records.

What's missing is the sprinkler valve and gauge checks. NFPA 25 has weekly and quarterly tasks, and the qualification rules (Division C, 2.2.4.4 and 2.2.4.6) contain no owner carve-out. Either have a qualified contractor do them, or ask your AHJ in writing whether it will accept your staff's records.

Before the fire inspector arrives

This one is for the AHJ's visit, not your contractor's. A Fire Safety Codes Officer will want to see paper and access.

  • ITM records on site, including the initial verification and acceptance reports (Division C, 2.2.1.2).
  • The fire safety plan in the building, reviewed within the last 12 months, with emergency procedures posted on each floor area (Division B, 2.8.2.1 and 2.8.2.14).
  • Supervisory staff who've been trained in the plan, and keys to the alarm panel and fire protection equipment within reach of whoever is on duty (2.8.1.2 and 2.8.1.3).
  • Extinguisher tags complete, with handwritten entries current.
  • A fire department key box, if your building needs one (Division C, 2.2.10.1).
  • Documentation for any accepted alternative to the code text, kept on the premises (Division C, 2.3.1.2).
  • A sign at each manual station asking people to call the fire department, if your alarm doesn't transmit to it (2.8.2.14).
  • A short list of open deficiencies, with what's been done about each.

In Edmonton, ask your contractor for owner view access in the Life Safety Inspection Vault (LIV). You'll see the same deficiency list EFRS sees. Our LIV explainer covers the background.

Records checklist

RecordHow long and where
Inspection, testing and maintenance reports for each systemOn site, and none destroyed within five years of being prepared (Division C, 2.2.1.2)
Initial verification, integrated systems testing and acceptance test reportsOn site, for the life of the system
Fire drill and evacuation recordsAt the premises
Extinguisher tagsOn the extinguisher, with monthly and annual entries handwritten
Documentation for accepted code alternativesOn the premises (Division C, 2.3.1.2)
Emergency generator recordsWritten records per CSA C282 (Division B, 6.5.1.4)
Backflow test reports (Edmonton)Test records on site; report to EPCOR within 5 business days through SwiftComply
Fire safety planIn the building, available to the fire department and the AHJ

Two habits help. Ask for the verification and acceptance reports at handover on a new build, because nobody can recreate them later. And keep the weekly and monthly logs even though nobody asks for them. After a claim, they're the only proof anyone was looking. Our fire protection closeout guide lists the records to collect.

Impairment quick reference

An impairment is any time a system, or part of one, is out of service. Testing counts. Decide who does what before the water goes off. Our impairment checklist works through a planned one step by step, and fire watch requirements in Alberta covers when a watch applies.

SituationWhat applies
Any shutdown, planned or notA notification procedure, and alternative measures while it lasts (Division B, 6.1.1.3 and 6.1.1.4). Fire alarm shutdowns: work the measures out with the fire department
Fire alarm out for more than 2 hoursNotify the fire department. Provide continuous surveillance when directed. Warn occupants under a procedure the fire department accepts (Division C, 2.2.7.2)
Sprinkler system out of serviceNFPA 25, Chapter 15: an impairment coordinator, tags at the control valve and fire department connection, and notice to the fire department, insurer and alarm company
Sprinklers out for more than 10 hours in 24One or more of: evacuate the area, an approved fire watch, temporary water, or an approved program removing ignition sources and limiting fuel
Hydrant altered or shut downThe fire department notified and approves it, and the hydrant is marked as it accepts (Division C, 2.2.7.2)
Hot work outside a noncombustible areaContinuous fire watch during the work and at least 60 minutes after, then a final inspection 4 hours after completion (Division B, 5.2.3)
Defect found and the owner won't fix itThe contractor notifies the fire department and the owner in writing (Division C, 2.2.7.2)
Edmonton deficiency affecting operation or coverageReport within 24 hours. It may require emergency repairs or fire watch

We couldn't find a published Edmonton rule on fire watch patrol intervals or who may act as fire watch. Ask EFRS Fire Prevention before a planned shutdown. If you're mid-emergency, call 780.760.0806.

Guides and pages by system

Guides and pages by situation

Blog articles worth keeping open

Sources

Want a second pair of eyes on the building?

Send the address and your last reports. We'll walk through what's due, what's overdue and what your staff can do themselves.

Book a walkthrough